References
Client: Elektroprivreda Crne Gore (Electric Power Industry of Montenegro) JSC Nikšić
♦ Reconstruction of boiler Phase I – Thermal Power Plant Pljevlja
♦ Reconstruction of boiler Phase II - Thermal Power Plant Pljevlja
♦ Reconstruction of the superheater KPP IV - Thermal Power Plant Pljevlja
♦ Reconstruction of heaters - Thermal Power Plant Pljevlja
♦ Regular annual boiler repairs - Thermal Power Plant Pljevlja
♦ Overhaul of mills - Thermal Power Plant Pljevlja
♦ Capital overhaul of turbine - Thermal Power Plant Pljevlja
♦ Capital overhaul of generators - Thermal Power Plant Pljevlja
♦ Annual “winter care” - Thermal Power Plant Pljevlja
♦ Overhaul of startup joints ZS-850 - Thermal Power Plant Pljevlja
♦ Overhaul of impeller - Thermal Power Plant Pljevlja
♦ Annual ongoing maintenance - Thermal Power Plant Pljevlja
♦ Restoration of pipe ash and slug Maljevac - Thermal Power Plant Pljevlja
♦ Thermal insulation systems - Thermal Power Plant Pljevlja
♦ Restoration of valve chambers pipeline – Hydropower Plant Perućica
♦ Annual ongoing maintenance - Hydropower Plant Perućica
♦ Restoration of the turbine sliding shutters - Hydropower Plant Perućica
♦ Restoration of high pressure pipelines - Hydropower Plant Perućica
♦ Overhaul of expansion joints and pipe openings revision
♦ ACP of passive relays at Slapačka Glava – Hydropower Plant Perućica
Client: Kombinat aluminijuma JSC, Podgorica
♦ General overhaul of the steam boiler K-4
♦ General overhaul of the steam boiler K-1
♦ General overhaul of the steam boiler K-2
♦ General overhaul of the steam boiler K-3
♦ Restoration of terminal handling and storage of alumina in port of Bar
♦ Ongoing restoration of the energetic unit
♦ Annual facilities maintenance of the KAP (Aluminum plant Podgorica)
♦ Making of the pipe registers and torus
♦ Restoration of the autoclaves
♦ Fabrication and installation of the separators
♦ Construction of the soda reservoir
♦ Restoration of the electrolysis cells
♦ Positional drafting of electrolysis cells restoration
♦ Thermal insulation of the KAP facilities
Client: Željezara a.d. Nikšić
♦ Annual maintenance of the power block
♦ Restoration of the energy related pipelines
♦ Restoration of kettles, cranes and steel mill furnaces
♦ General restoration of the steam boiler K-3
♦ Restoration of the steam boiler K-2
♦ Restoration of the electrode electric furnace copper pipes
♦ Replacement of the clamp rack on UHP-1 furnace
♦ Restoration of the profit centers covers
♦ Overhaul works on facilities of combined rolling mill plant
♦ Restoration of the grid bridging crane and carts
♦ Fabrication and installation of the halls hangar doors
♦ Production of connected pipelines for new electrical furnaces
♦ Thermal insulation of ironworks facilities
Client: Jugopetrol JSC, Kotor
♦ Relocation and reconstruction of reservoir R-11 - AS Tivat
♦ Restoration of the reservoir R-1 - AS Tivat
♦ Restoration of the reservoir R-2 - AS Tivat
♦ Restoration of the reservoir R-3 - AS Tivat
♦ Restoration of the reservoir R-16 - Bar
♦ Restoration of the reservoir R-17 Bar
♦ Restoration of the reservoir R-15 Bar
♦ Construction and restoration of the group of reservoir R-19 to R-23-Bar
♦ Restoration of the reservoir R-3 - Installation Lipci
♦ Annual maintenance - Installation Bar
♦ Making of pipelines No. 300 to R-19 to R-23
♦ Making of pipelines No. 150
♦ Restoration of the pipelines No. 250
♦ Making pipelines in the group tanks - Installation Bar
♦ Construction of the PP (firefighting) protection of the emergency containers on the tanks - Bar
♦ Fire fighting protection system - Installation Bar
♦ Restoration of the boilers installation Bar
♦ Making of connected pipelines installation Bar
♦ Thermal insulation of the JPK Kotor facilities
Client: Djuro Djaković d.d. Slavonski Brod
♦ Reconstruction of the terminal for cement loading in the Port of Bar
Client: Viomer Solun
♦ Change of purpose of the tanks and connected pipelines of asphalt bases
Client: Elektroprivreda RS a.d. Bijeljina
♦ Reconstruction of boiler - Thermal power plant Gacko
Client: Jadransko brodogradilište a.d. Bijela
♦ Overhaul of formwork and piping systems
Client: Prijestonica Cetinje
♦ Reconstruction of the boiler room and distribution box in the Municipality and hospital complex
Client: Novi Obod a.d. Cetinje
♦ Construction of the cyclopentane pipelines
Client: Vektra a.d. Podgorica
♦ Facility Maintenance Anotech-Anodes
Client: Pivara Trebjesa a.d. Nikšić
♦ Thermal insulation of the tank
Client: Javorak a.d. Nikšić / Mi+rai a.d. Nikšić
♦ Restoration of power block
♦ Overhaul of the fire-place portion of the boiler
♦ Restoration of the calorifier heating
♦ Restoration of the pipe distribution box
Client: Fabrika elektroda PIVA a.d. Plužine
♦ Restoration of the hot water boiler and distribution box
♦ Restoration of the power plant chimney
Client: Centralna banka CG
♦ Restoration of the hot water boiler and distribution box
Client: Društveni standar i ugostiteljstvo a.d. Nikšić
♦ Restoration of the hot water boiler and distribution box
Client: MMK društveni standard a.d. Nikšić
♦ Restoration of central heating of the winter resort Vučje
♦ Restoration of central heating of the Hotel Metalurg
Client: MSK a.d. Kikinda
♦ Restoration of the terminal for reloading acid in Port of Bar
♦ Replacement of the spiral pipes system on a boiler TE-803
Client: Gitanes export d.o.o. Nikšić
♦ Making of connected pipeline installation of the gas station
Client: Plantaže a.d. Podgorica
♦ Restoration of the boiler plant
♦ Restoration of distribution box of the bottling facilities
♦ Restoration of the heat exchangers
Client: JP Vodovod i kanalizacija Bar
♦ Restoration of pipe fittings and fittings of the pumping stations
♦ Fabrication and installation of fittings of well connectors
♦ Restoration of tubular junction on the water station in Sutomore
Client: JP Vodovod i kanalizacija Podgorica
♦ Making the reservoirs for road tankers and adaptation
♦ Fabrication and installation of riser pipe fittings
Client: JP Vodovod i kanalizacija Cetinje
♦ Restoration of the trunk pipelines and pumping stations
Client: JP Vodovod i kanalizacija Nikšić
♦ Reconstruction of the main pipe lines of Vidrovan
♦ Reconstruction of the main pipe lines – Gornje polje
♦ Making fittings rail pipeline
Client: Primorka a.d. Bar
♦ Restoration of heater of the heat exchanger
♦ Restoration of the boiler plant
Client: VK Primorac Kotor
♦ Restoration of the hot water boiler and distribution box
Client: Štamparija Obod a.d. Cetinje
♦ Restoration of the hot water boiler and distribution box
Client: Nimont d.o.o. Bar
♦ Overhaul of steel hull "Anja"
Client: Centralna narodna biblioteka CG Cetinje
♦ Restoration of the hot water boiler and distribution box